Frequently Asked Questions
 
 
This Page will provide you with a list of frequently asked questions, if what you wish to know is not listed here, Our Sales representative will be happy to discuss any concerns you may have.
 
 
• Tile and coping:
 
 
The length of time a pool will be under construction for renovation is directly related to the extent of the work we are performing. Pools that are being refinished with plaster can be operational in ten- fourteen days/weather permitting. Pools that require tile and coping or are being extensively remodeled require additional construction time. Be assured that when a project commences Rodriguez Bros will make every effort to consistently move the job along and complete your project in a timely manner.
 
 
May I remodel my pool during the winter?
 
 
Remodeling a swimming pool during the winter has a number of advantages. Obviously, pools are generally not used in the winter and your family will not be without the use of the pool during the swim season. Since the pool renovation business is somewhat cyclical, it is also easier to obtain desired scheduling when we are not in the busy season. We punch a hole in deep end of pool to protect again water pressure under pool.
 
 
Why is Diamond Brite or River Rok more expensive than plaster?
 
 
Diamond Brite and River Rok utilize naturally tumbled pebbles and specifically formulated cement, which is more expensive than standard plaster. Installation with Diamond Brite or River Rok is a process that requires each installer be trained, certified, and subject to continuing education in the field. In the event you choose Diamond Brite and River for your pool you may expect a longer service life and less maintenance required as compared to traditional plaster.
 
 
• What is the warrantee?
 
 
Standard white or grey plaster is 3 years. If you add our protective additives to standard plaster we give a 5 year warranty. If River Rok is installed we will provide a written warranty statement covering at least five (5) years.
 
 
• Plumbing and electrical under the decks:
 
 
If decks are being replaced, this would be the time to consider replacement of plumbing and electrical runs. Copper plumbing and galvanized electric runs should be replaced with non-metallic pipe.
 
 
 
• Skimmer:
 
 
Whether or not decks are being replaced, your skimmer should be evaluated for possible replacement. Certain skimmer designs are problematic.
 
 
• Can Rodriguez Bros Pool Plastering handle my entire pool renovation project?
 
 
Rodriguez Bros has the capability to manage, both by the utilization of its employees and by the selective use of other contractors, just about every facet of the pool renovation process. We specialize in specific aspects of pool plastering, minor construction and when other areas of expertise are needed we rely on relationships built up over the last forty years to supply the necessary services. Rodriguez Bros’ goal is to establish efficient integration of these services to provide you with a swift and professional pool remodel experience.
 
 
THE CONSTRUCTION PROCESS
 
 
• Our project has started, but crews do not always arrive first thing in the morning and some days they do not come to the job site at all. Is this normal?
 
 
Our crews are trained to perform specific pool remodel functions and it is therefore not unusual for a crew to be scheduled on more than one job per day. Depending on where your pool is relative to the schedule, it is quite normal to see people arrive at mid-day or even in the late afternoon. Generally, off days are planned to allow material to fully cure before the next phase of construction or to provide schedule spacing in the event more time is needed for phase completion than anticipated.
 
 
• Are there any phases of construction, which are particularly messy?
 
 
While our crews make every attempt to minimize the impact upon the area surrounding your pool, a remodel site can be dusty. We therefore recommend that pool furniture and potted plants be moved away from the pool area while construction is in progress. It is also suggested that windows be kept shut near the pool for the duration of the pool remodel.
 
 
• Our pool was just prepared for resurfacing. Why is the surface very uneven with large holes and streaks?
 
 
It is important that our crew remove all of the old delaminating plaster prior to resurfacing. We punch a hole in deep end of pool to protect again water pressure under pool. A rough surface is expected in most pools since not all areas are delaminating. Once the new plaster or Diamond Brite/ River Rok has been installed you are not able to see the previously cratered and holes areas.
 
 
• Should we use the local water supply to refill our newly remodeled pool?
 
 
The only alternative to your local water supply is the purchase of water by truck. Water fill by truck is generally high-priced and as a result most people utilize either water supplied by their local water district or by a well on site. Special precautions should be taken when using well water or water that is soft. We strongly urge you to consult with your pool service professional or contact our office in this situation.
 
 
• Why choose Rodriguez Bros Pool Plastering?
 
 
Rodriguez Bros has the resources and the expertise to provide the latest in materials and construction techniques for the upgrade of your pool. Our company is a leader in the ongoing development of pool renovation technology. Rodriguez Bros has over 30 employees and a full service department to meet all of your remodeling needs. We fulfill all licensing and insurance requirements for a construction business, including contractor’s license, contractor’s bond, home improvement salesperson licenses, worker’s compensation insurance, general liability insurance, and automobile insurance.
 
 
 
 
.